Right in the heart of London, at the prime location of 40 Broadway, we’re working on an impressive project: 600 square metres of rooftop terraces and balconies, spread across four floors. All installed with our A1 Smart- Ped system.
Our client Pritchard & Pritchard chose our A1 Smart-Ped and for good reason. It makes a real difference: fast to install, saving significantly on labour time and costs. A smart and efficient choice.

Or as Cristian Prell from Pritchard & Pritchard put it:
“These pedestals are really easy to work with. The best we’ve worked with until now! We were looking for a solution that saves time without compromising quality. Due to the location we were concerned about wind uplift and we needed a non combustible solution, which would perform in arduous circumstances for the lifespan of the building, giving us complete confidence. The A1 Smart-Ped delivered exactly that.”
40 Broadway is located in central London, which made logistics a challenge. Thanks to our partner Wraxalls, who keeps the A1 Smart-Ped system in stock, we were able to deliver right into the city without a hitch.
Real feats of engineering
This unique, patented pedestal system is specially designed to meet non-combustible fire safety requirements and to combat wind uplift.